| Surface Preparation |
Application floor should be cleaned from loose parts, oil and other chemicals and surface defects are repaired with a suitable repair mortar LRC RM. All expansion and movement joints should be filled with an elastomeric joint sealant.
|
| Preparation Instructions |
LRC PRIMER CP is ready for use. With mixer at low speed (approximately 300 rpm / min) with vigorous stirring until a homogenous mixture is obtained (about 3 minutes).
|
| Application |
LRC PRIMER CP driven into the ground with the help of a textured roller and allowed to dry evenly. Drying time will vary depending on the weather conditions and the state of the ground. In the case of the application several times, should be expected to 24 hours between coats. Drying takes place after about (24 hours), cement or gypsum-based plaster is applied.
|
| Things to pay attention |
• Early or late changes in the institution can be observed for different application environments and different thicknesses.
• Not suitable for exterior surfaces. LRC RM AC should be preferred with this type of surfaces.
• Not suitable for high humidity places such as Turkish bath, swimming pool, sauna, bath, and so on. LRC RM AC should be preferred with this type of surfaces.
|
| General considerations |
The above product information and explanations are based on our experience and the end result of our careful research. The diversity of the materials involved, the different construction and working conditions cannot be individually controlled or influenced by us. In non-control applications, the warranty status is limited only to the quality of the product sold. There is no guarantee for the application other than the production of the product. This technical paper invalidates the previous existing form. The quality of the work done may vary depending on your professional use of the product. If you are unsure, do a little test or get technical help.
|
| Disposal |
Empty packaging can be disposed of in collection boxes according to local-local regulations or recycling rules. After drying and hardening the used waste material, dispose of it as construction waste. It is dangerous to destroy product residues by burning.
|
| Safety Information |
Keep the products out of the reach of children. Keep the covers of the products closed. It is recommended to wear gloves and goggles during work. If the skin comes into contact with the material, it should be washed with soapy water immediately. In case of contact with eyes, seek medical advice immediately. For more detailed information, see the material safety data sheet.
|