| Surface Preparation |
The floor, on which there will be application, should be cleaned of all loose parts, oil and other chemicals and the defects on the surface are repaired with first line classic mortar by being bought to scale. This process is not necessary for the other lines.
|
| Preparation Instructions |
(25 kg) powder material is poured into 7-8 liters (it may vary depending on air temperature) of clean and cool mixing water and with a low-speed and suitable mixer, a smooth homogeneous mixture is obtained in 3-4 minutes. Water shouldn’t be added to powder material.
After resting the mixture for 3-5 minutes it is stirred again and applied on gas concrete with the same thickness and combed. Right after, gas concrete blocks (within 10-15 minutes) are placed on the surface and tamped. During the process of walling, horizontal and vertical joint should be left and the joints should be 3 mm. maximum. Joint intervals should be filled completely with the prepared mixture.
|
| Things to pay attention |
• Do not use mortar that is past the usage period or crumbling. The hardened mortar should not be diluted again. Do not moisten the applied adhesive to prolong the exposure time, as it will affect the adhesion performance.
• Only apply strong, prepared surfaces. Coatings should be pre-moistened.
• Do not apply thicker than recommended.
• Applications should be protected from rain, frost, wind, sunshine and high temperatures for the first 24 hours.
|
| General considerations |
The above product information and explanations are based on our experience and the end result of our careful research. The diversity of the materials involved, the different construction and working conditions cannot be individually controlled or influenced by us. In non-control applications, the warranty status is limited only to the quality of the product sold. There is no guarantee for the application other than the production of the product. This technical paper invalidates the previous existing form. The quality of the work done may vary depending on your professional use of the product. If you are unsure, do a little test or get technical help.
|
| Disposal |
Empty packaging can be disposed of in collection boxes according to local-local regulations or recycling rules. After drying and hardening the used waste material, dispose of it as construction waste. It is dangerous to destroy product residues by burning.
|
| Safety Information |
Keep the products out of the reach of children. Keep the covers of the products closed. It is recommended to wear gloves and goggles during work. If the skin comes into contact with the material, it should be washed with soapy water immediately. In case of contact with eyes, seek medical advice immediately. For more detailed information, see the material safety data sheet.
|