| Surface Preparation |
The floor to be applied must be free from loose particles, oil and other chemicals. Before filling the joints, the adhesive used should be expected to get sufficient hardness.
|
| Application |
Components A and B are mixed together until a homogeneous color is formed (about 3 minutes) with a 400 revolutions per minute mixer .
LRC™ EPOFUGA can apply with trowel or mouth filling gun.
Practice with trowel;
The prepared mortar is filled with joints by spreading on the surface to be applied and scraping it well with a plastic or hard rubber trowel. Wait for 15-30 minutes depending on the surface temperature.
Application with mortar gun;
After filling the prepared mortar with the stuffed gun in the mouth, a suitable nozzle is inserted and discharged into the joints. The joints are filled with a plastic or hard rubber trowel. Wait for 15-30 minutes depending on the surface temperature.
First Cleaning:
After 15-30 minutes, the material overflowing from the joints is cleaned with the help of hot detergent water using a suitable sponge and the final shape is given. Cleaning and cleaning should be avoided in the form of scrubbing.
Last Cleaning:
Last film layer on the surface should be cleaned by circular movements with the help of suitable sponge and hot detergent water after 4 to 10 hours (depending on the temperature) after application and the surface should be cleaned by adding 10% spirit to the final cleaning water.
LRC™ EPOFUGA is also suitable to be filled with a polishing machine and cleaned with felt.
|
| General considerations |
The above product information and explanations are based on our experience and the end result of our careful research. The diversity of the materials involved, the different construction and working conditions cannot be individually controlled or influenced by us. In non-control applications, the warranty status is limited only to the quality of the product sold. There is no guarantee for the application other than the production of the product. This technical paper invalidates the previous existing form. The quality of the work done may vary depending on your professional use of the product. If you are unsure, do a little test or get technical help.
|
| Disposal |
Empty packaging can be disposed of in collection boxes according to local-local regulations or recycling rules. After drying and hardening the used waste material, dispose of it as construction waste. It is dangerous to destroy product residues by burning.
|
| Safety Information |
Keep the products out of the reach of children. Keep the covers of the products closed. It is recommended to wear gloves and goggles during work. If the skin comes into contact with the material, it should be washed with soapy water immediately. In case of contact with eyes, seek medical advice immediately. For more detailed information, see the material safety data sheet.
|