| Surface Preparation |
In order to obtain a healthy application and solid floor, the new poured concrete should be at least BS–25 class or 350 dosed concretes. It is useful to use a suitable LRC Primer as an adhesive between old and new concrete.
LRC M8, should be applied when a 3-5 mm thickness of foot print is left on the surface upon stepping down on the concrete. There shouldn’t be much water on the surface. Accumulated water must be taken away from the surface and it must be moist.
2/3 of the material that will be used is spread on the surface homogeneously and waited for every part of it to become evenly moist (color change should be observed).Material is fed into the concrete by tray glazing and concrete integration is ensured.Rest of the 1/3 material part is spread on the surface homogeneously the same way and waited for every part of it to become evenly moist (color change).Then, it is fed into the surface and glazed.
After a surface hardness that allows walking on it is obtained, finishing glaze is done on the material in order to get a quality surface.
When the LRC M8 application is over, it is recommended to use LRC Cure material in order to prevent early drying and wet shrinkage cracks and increase surface performance.
|
| General considerations |
The above product information and explanations are based on our experience and the end result of our careful research. The diversity of the materials involved, the different construction and working conditions cannot be individually controlled or influenced by us. In non-control applications, the warranty status is limited only to the quality of the product sold. There is no guarantee for the application other than the production of the product. This technical paper invalidates the previous existing form. The quality of the work done may vary depending on your professional use of the product. If you are unsure, do a little test or get technical help.
|
| Disposal |
Empty packaging can be disposed of in collection boxes according to local-local regulations or recycling rules. After drying and hardening the used waste material, dispose of it as construction waste. It is dangerous to destroy product residues by burning.
|
| Safety Information |
Keep the products out of the reach of children. Keep the covers of the products closed. It is recommended to wear gloves and goggles during work. If the skin comes into contact with the material, it should be washed with soapy water immediately. In case of contact with eyes, seek medical advice immediately. For more detailed information, see the material safety data sheet.
|