| Surface Preparation |
The floor, on which there will be application, should be cleaned of all loose parts, oil and other chemicals and the defects on the surface are repaired with LRC RM. If the temperature of the surface, where the application will take place, is above 25°C, surface is moistened and saturated.
|
| Preparation Instructions |
LRC 2KF A:Liquid component is poured into a clean application cup and B:Powder component is completely emptied in it, and with a low-speed and suitable mixer, a smooth homogeneous mixture is obtained in 3-4 minutes until all the lumps disappear. After resting the mixture for 3-5 minutes it is stirred again and made ready for use. (Depending on the air temperature, water may be added to the mixture) Application can be done with a brush or trowel.
|
| Application |
It is recommended to add water to the mixture and perform a thin layer with a brush and then go on to second layer. Each layer thickness shouldn’t be more than 2 mms. It is necessary to give 2-6 hours of drying period (depending on the environmental conditions) between each layer. For the plaster mesh applications; plaster mesh is placed on the surface while the first layer looks wet-dry and second layer is applied with a brush or trowel. Surface temperature should be a minimum of + 5 C. Applications should be protected from rain, frost, wind, direct sunlight and high temperature during the first 24 hours. Hardened mortar shouldn’t be watered.
|
| General considerations |
The above product information and explanations are based on our experience and the end result of our careful research. The diversity of the materials involved, the different construction and working conditions cannot be individually controlled or influenced by us. In non-control applications, the warranty status is limited only to the quality of the product sold. There is no guarantee for the application other than the production of the product. This technical paper invalidates the previous existing form. The quality of the work done may vary depending on your professional use of the product. If you are unsure, do a little test or get technical help.
|
| Disposal |
Empty packaging can be disposed of in collection boxes according to local-local regulations or recycling rules. After drying and hardening the used waste material, dispose of it as construction waste. It is dangerous to destroy product residues by burning.
|
| Safety Information |
Keep the products out of the reach of children. Keep the covers of the products closed. It is recommended to wear gloves and goggles during work. If the skin comes into contact with the material, it should be washed with soapy water immediately. In case of contact with eyes, seek medical advice immediately. For more detailed information, see the material safety data sheet.
|